Package 05 of 10 · $150,000 AUD

Tender & Build Management Lite$150,000 AUD

We own the builder relationship from contract to keys.   Documentation, tender, contract review, contract administration, 20 site visits, variation management and a clean practical completion — everything to keep your builder honest.

$150,000 AUD · Design 12 weeks + build 9–12 months · Single dwelling up to 350 m² or dual-occupancy

Tender & Build Management Lite.We own the builder relationship from contract to keys.

Homeowners who don't want to manage a builder themselves. Knockdown-rebuilds, small custom homes, granny flat + main residence combos.

20Site visits during build
3Builders tendered
WeeklySite reports
24 monthsStanton Desk access
Step-by-step

How we deliverthis package.

01

Everything in 04

Full CD set, tender package, specification, schedules.

02

Builder shortlist

We help you shortlist three suitable builders — by HIA / MBA membership, current workload, comparable past projects.

03

Tender comparison

Apples-for-apples comparison of returned tenders. Allowances vs PC sums vs fixed inclusions, side-by-side.

04

Contract review

Independent review of the HIA / MBA contract before you sign. We flag clauses worth pushing back on.

05

Pre-start meeting

Run the pre-construction meeting with you and the builder. Sign-off on starting drawings and specification.

06

Site visits

20 scheduled site visits across the build — frame stage, lock-up, fit-out, hand-over, plus on-call.

07

Variation management

Every variation routed through the Desk. Pricing checked, drawings updated, you sign off in writing.

08

Progress claim review

Every builder progress claim reviewed against the actual stage of works before you pay.

09

Practical completion + defects

We walk the house with you at PC. Defect list logged in the Desk. Followed up through the 13-week defect liability period.

10

Hand-over

As-built drawings, certificates, warranties, manuals — all archived in the Desk for life of the home.

What you get

Everything inthis package.

Included

Everything in 04 Construction Documentation

Included

Builder shortlisting (HIA / MBA, current capacity)

Included

Tender comparison + negotiation

Included

Building contract review

Included

Pre-start meeting facilitated

Included

20 site visits across construction

Included

Weekly site reports in the Stanton Desk

Included

Variation management + pricing checks

Included

Progress claim review

Included

Practical completion walk-through + defects list

Included

13-week defect liability period support

Included

24 months Stanton Desk access

Not in this tier.

Want us to deliver design + build under one fixed price? Step up to 06 Custom Home Build (Standard).

Not in this tier

Build cost (paid direct to your builder, typically $700k–$1.5M for this tier)

Not in this tier

Council / authority fees

Not in this tier

Engineer fees (at cost)

Not in this tier

Bespoke joinery design (refer 06)

Direct inquiry

Send Stanton a noteabout this package.

One business-day reply. The team reads every message. Or download the 05 Tender & Build Management Lite PDF ($150,000) — full scope, what's included and what isn't.

Download PDF instead

We use your details only to reply to your inquiry. See privacy.

Package 05 · $150,000

Book theTender & Build Management Lite package.