Package 03 of 10 · $39,000 AUD

DA / Council Approval Pack$39,000 AUD

Lodged, energy-rated and ready for your council planner.   Every drawing, report and consultant you need to lodge a Development Application — including planner liaison, BASIX/NatHERS, site survey coordination and a pre-DA council meeting.

$39,000 AUD · 10 weeks design + council clock · Up to two floors + garage / studio, up to 450 m²

DA / Council Approval Pack.Lodged, energy-rated and ready for your council planner.

Anyone in a DA pathway: NSW, ACT, Vic Heritage overlay, complying-development edge cases, knockdown-rebuilds in established suburbs, dual-occ and small subdivisions.

12Design meetings
UnlimitedRevisions during design
30Photoreal renders
12 monthsStanton Desk access
Step-by-step

How we deliverthis package.

01

Kick-off + council read

We pull your LEP/DCP, planning controls, FSR, height limits, heritage and bushfire mapping. You know the rules before we draw a wall.

02

Survey & geotech coordination

We coordinate licensed surveyor and (if required) geotech engineer engagement on your behalf.

03

Design to controls

Plans, elevations and sections drawn to comply with your council's controls — setbacks, overlooking, solar access, landscape ratios, FSR.

04

BASIX / NatHERS

Energy assessor engaged early so the design hits the energy target without painful late changes.

05

Pre-DA meeting

We attend the council pre-DA meeting with you — face-to-face with the planner before lodgement.

06

Statement of Environmental Effects

SEE prepared, addressing every clause the planner will check.

07

DA drawing set

Cover sheet, location plan, site plan, demolition plan, plans, elevations, sections, shadow diagrams, materials schedule.

08

Lodgement

We lodge through the NSW Planning Portal / PlanSA / VicSmart / equivalent and own the RFI cycle with the planner.

09

Render & flythrough

30 photoreal renders + a flythrough video — great for neighbour notification responses.

10

Hand-over

Stamped DA drawings, conditions of consent, energy certificate and the full Stanton project file.

What you get

Everything inthis package.

Included

Everything in 02 Schematic

Included

Site survey + geotech coordination

Included

BASIX or NatHERS energy rating

Included

Statement of Environmental Effects

Included

Shadow diagrams + solar access study

Included

Materials & colours schedule

Included

Pre-DA council meeting attendance

Included

DA lodgement + RFI management

Included

30 photoreal renders + flythrough video

Included

12 meetings · unlimited revisions during design

Included

Stanton Desk access for 12 months

Not in this tier.

Approved? Now you need drawings to build from — step up to 04 Construction Documentation.

Not in this tier

Council DA fees (paid direct to council)

Not in this tier

Structural / hydraulic / electrical engineering

Not in this tier

Construction documentation

Not in this tier

Builder tender

Direct inquiry

Send Stanton a noteabout this package.

One business-day reply. The team reads every message. Or download the 03 DA / Council Approval Pack PDF ($39,000) — full scope, what's included and what isn't.

Download PDF instead

We use your details only to reply to your inquiry. See privacy.

Package 03 · $39,000

Book theDA / Council Approval Pack package.